Home > Your Region > Cornwall
Cornwall
See what is going on around the South West
Cornwall | Devon | Somerset | Dorset | Bristol & West
Wiltshire | Gloucestershire
Cornwall Case studies
Advanced Metals International
10% Lead time improvements ( from receipt to dispatch ),20% Increase capacity with the order processSector: Electro / mechanical sub-assemblies
Size: 15 employees
Advanced Panel Systems
Potential Productivity Improvements > 48%Sector: Timber / Carpentry
Size: 20 employees
Atlantic Inertial Systems
Yield problem resolved and now running at a consistent 99.7%Sector: Electronic assembly
Size: 270 employees
Atlantic Inertial Systems
Scrap rate reduced to 0.5%Sector: Electronic assembly
Size: 270 employees
Caterlink Ltd
The project to date has resulting in 25% productivity improvement.Sector: Food & Drink
Size: 20 employees
Chough Bakery
Experienced reduction in distance travelled and time taken within production processSector: Food & Drink
Size: 25 employees
D P Engineering
The productivity improvements resulted in a 30% increase in turnoverSector: Electro / mechanical sub-assemblies
Size: 25 employees
Hellermann Tyton
400% improvement in extrusion CapacitySector: Rubber / Plastics
Size: 207 employees
Infoteam
Creation of 35 sq metres of space in the production areaSector: Electronic assembly
Size: 150 employees
Lowley Engineering
Standardised work procedures implemented across all aspects of the factory.Sector: Electro / mechanical sub-assemblies
Size: 18 employees
Manuplas
Approx 40% saving in distance travelled after the resiting of the plantSector: Rubber / Plastics
Size: 18 employees
Nelson Stokes Ltd
Nelson Stokes experienced a reduction in operational elements of 25%Sector: Electro / mechanical sub-assemblies
Size: 60 employees
Pendennis Shipyard Ltd
Pilot area set up with Lean Tools, daily trade&employee targets set up for project manager to reviewSector: Building / Construction
Size: 180 employees
R A M Gasket Solutions Ltd
Reduction in stock parts of 50%Sector: Rubber / Plastics
Size: 14 employees
Righton Ltd (Saltash)
A reduction of 19.5 mins for order picking and 30 mins for Goods-in processing each day.Sector: Miscellaneous
Size: 19 employees
W C Rowe (Falmouth) Ltd
Undertook a series of manufacturing simulation days (six in total) covering 70 plus staffSector: Food & Drink
Size: 450 employees
Free Newsletter – SIGN UP
Our FREE ezine gives you an insider’s look at the most important new sustainable developments to improve your manufacturing business. See back issues>